The Ecoenergy Power Plant #1 for the company DH Ecoenergías must be an icon and a reference within energy and environmental transition. Therefore, its architecture must symbolize this shift of paradigm. A transparent infrastructure that shows, as part of its pedagogical role, how renewable energies are improving the public health in our cities. The plant will serve the new District Heating network for the city of Palencia, supplying ecological hot water to more than 3000 housing units.

No items found.

Energy / Infrastructures: the scale of the collective

Medium-sized cities have become the spearhead of a new sustainable urbanity, which is committed to soft mobility, energy communities, ecological corridors, cradle-to-cradle design and advanced architecture.

Transparency / Architecture: the scale of the disciplinary

This project must be an icon and a reference within energy and environmental transition. Therefore, its architecture must symbolize this shift of paradigm. A transparent infrastructure that shows, as part of its pedagogical role, how renewable energies are improving the public health in our cities.

Periphery / City: the scale of the cultural

The periphery of contemporary cities is increasingly marked by the presence of large logistic facilities that serve the gentrified dense city and the new life of teleworking -in the city and outside it-, lacking urban architectural or landscape character. The architecture of the emblematic places, the centers of our cities, the monuments and big public buildings has already been built. Today we architects need to focus our attention on places that grow without a center, without urbanity, without character, without architecture... it is a generational task and an opportunity for our cities that we must not miss.

No items found.

DH Ecoenergy Plant #1

District Heating Thermal Power Plant

2022

Client: DH ECOENERGIAS

Surface: 1.960 m2

Location: Palencia, Spain

Project start: 09.2019

Building start: 07.2021

Building end: 09.2022

Project leaders

Pablo Oriol, Fernando Rodríguez

Collaborators

Adrián Sánchez, Mikhail Frantzusov

Consultants

DH ECOENERGÍAS, MECANISMO INGENIERÍA, JESUS EGUREN, MARC BUXÓ, JUAN TUR, NUMMIT

Images

Luis Asín